Deck & Pathway Removal
Remove back deck and side wood pathway.
Debris & Obstruction Clearing
Remove debris, garbage, and obstructions.
Machine Access Preparation
Prep machine access for backyard excavation.
Machine Mobilized
Mobilize excavator and equipment to site.
Yard Clearing
Clear unwanted plant/tree material and waste.
Rock & Flowerbed Removal
Remove rocks and flowerbeds as discussed.
Stump Removal (Grinded)
Remove stumps incl. hidden stump under old path.
Topsoil Removal (2")
Remove top 2" of soil from backyard.
Rough Grading
Rough grade backyard to natural slope for drainage.
Retaining Wall Excavation
Excavate for new retaining wall footprint.
Remove Old Retaining Wall
Remove existing retaining wall material.
Gravel Base Installation
Supply and compact gravel base for wall.
Formwork & Rebar
Install wall formwork, rebar, and chamfer edges.
Drain Tile (Wall Base)
Install drain tile at wall base.
Concrete Wall Pour
Pour concrete retaining wall incl. 90° corner (~15ft).
Strip Forms
Strip concrete forms after cure window.
Backfill Wall
Backfill behind retaining wall in lifts.
House Drainage & Basins
Install catch basins, drain rock & filter cloth by house.
Rock Breaking & Removal
Break oversized rocks with expanding grout; remove.
Concrete Stairs (3)
Pour 3 concrete stairs into sloped yard section.
Replace Dirt (Driveway→Backyard)
Replace dirt from driveway to backyard.
Soil Prep for Sod
Rake, sift, fine grade backyard for sod.
Driveway Concrete Prep
Prep hole in driveway for concrete patch.
Sod Installation
Install and water new sod in backyard.
Front Deck Demo & Inspect
Remove railings and inspect framing.
Front Deck Re‑Framing (LVL)
Reframe deck; install doubled-up LVL beams.
Hidden Gutters & Fascia
Install hidden gutters, fascia, T&G plywood, flashing.
Vinyl & Sealing
Fill seams, install vinyl membrane and sealing.
New Railing
Install new railing (color TBD).
Drain Pipe Hook‑Up
Hook up drain pipe for front deck seamless gutters.
Landing & New Stairs
Add landing; new stairs to pad/pavers.
Deck Board Repairs
Repair rotted deck boards at house connection.
Final Site Cleanup
Final site cleanup and debris removal.